Home Remodeling in Renton, WA
Kitchen, bathroom and whole-home remodeling for Renton homeowners, from a licensed Washington general contractor. Free on-site estimates.
- WA License #AMERIHB759N2
- Free on-site estimates
- Renton permits handled
Renton Remodeling Contractor for Kitchens, Baths and Whole Homes
American Home Builders remodels kitchens, bathrooms, basements and whole homes in Renton, WA. One team takes the job from the first walkthrough to the final city inspection: design, the Renton permit, construction and the handover.
We work across Renton, including Kennydale, the Highlands, the East Plateau, Benson Hill, City Center and the Valley.
Licensed in Washington: construction contractor license #AMERIHB759N2 (General), listed as active by the Department of Labor & Industries. Verify it on L&I.
What Are You Planning?
Pick a project to see what it covers and whether Renton is likely to ask for a permit.
Kitchen remodeling in Renton
New layouts, custom cabinetry, countertops, backsplash and lighting, planned around how you cook and how the kitchen connects to the rest of the house.
Permit: cabinets, countertops and tile are on Renton’s no-permit list. Changing walls needs a building permit, and electrical, plumbing and mechanical work each need their own.
What's included
- Layout and design planning
- Cabinets, countertops and backsplash
- Lighting and electrical updates
- Plumbing and gas line moves
Bathroom remodeling in Renton
Walk-in and curbless showers, soaking tubs, vanities, custom tile and storage, laid out to fit the room you have.
Permit: tile and other finish work need no permit. Plumbing work needs a separate permit. On a septic property, adding a bathroom also needs King County approval first.
What's included
- Walk-in and curbless showers
- Tubs, vanities and fixtures
- Tile floors and walls
- Ventilation and lighting
Basement and attic remodeling
Turn unfinished or underused space into a bedroom, an office, a gym or a family room.
Permit: finishing or converting a space is an alteration, so it needs a permit. Structural changes may need plans stamped by a licensed Washington architect or engineer.
What's included
- Framing and drywall
- Insulation
- Electrical and lighting
- Flooring and finishes
Whole-home remodels and conversions
Open up a floor plan, update several rooms in one project, or turn the garage into living space.
Permit: an asbestos survey is required before renovation or demolition. Walls need a building permit; electrical, plumbing and mechanical permits are separate.
What's included
- Open floor plans
- Garage conversions
- Whole-home rewiring
- Multi-room updates
Windows, doors, decks and roofing
Exterior work that protects the house and changes how it looks from the street.
Permit: in-kind re-roofing with the sheathing left in place is exempt; replacing sheathing is not. Decks more than 30 inches above grade, measured with a 5-foot perimeter, need a permit.
What's included
- Window and door replacement
- Deck building and remodeling
- Roofing
- Exterior painting
Does Your Renton Remodel Need a Permit?
Renton Municipal Code 4-5-060 requires a permit before you build, alter, repair, demolish or convert a house or its electrical, gas, mechanical or plumbing systems, and lists the work that is exempt. Tick what your project includes to see which side of the line it falls on, based on the code and the city’s Building Permits FAQ.
Tick what your project includes
You'll see which items are on the city's permit list and which are on its no-permit list.
A summary of Renton Municipal Code 4-5-060 and the city’s Building Permits FAQ, not a ruling. Confirm with Renton Permit Services at 425-430-7215 before work starts.
Remodeling in Renton: What to Plan For
How you apply depends on the job. Renton’s Civic Access portal takes electrical, mechanical, plumbing and re-roof applications online. For other work, including an interior remodel, the project details go by email to the city’s permit team, which replies with an upload link (City of Renton).
Plan for the review time. Allow 5 days for the initial application review. First review decisions typically take 2 to 3 weeks, and Renton does not offer expedited review.
Asbestos and septic. An asbestos survey is required before renovation or demolition work. On a septic property, adding a bedroom or bath needs King County Environmental Health approval before the city approves the permit.
Do not start before the permit. Starting regulated work without one can bring a stop work order and a special investigation fee equal to twice the permit fee (RMC 4-5-060).
Critical areas and flood zones. Renton’s exemptions do not apply in these areas, so even a small job can need a permit. We check the property before we price the work.
How a Renton Remodel Works With Us
Five steps, the same on every project, with the permit and the city inspections built into the schedule.
- 01
Free in-home consultation and written estimate
We visit, look at the space, talk through what you want and give you a detailed written estimate.
- 02
Design, plans and material selections
Plans and 3D renderings, plus cabinets, tile, fixtures and finishes, settled before work starts.
- 03
Renton permit and plan review
We submit the application to Renton Permit Services and work through the city’s plan review.
- 04
Construction and city inspections
Demolition, framing and rough-ins, with the required city inspections along the way.
- 05
Final inspection and walkthrough
Finish work, the city’s final inspection, then a walkthrough with you before handover.
Before and After
Drag the handle to compare. More projects in our before and after gallery.
BeforeAfter
Renton Remodeling FAQ
Do I need a permit to remodel a kitchen in Renton, WA?
Only if the work goes past finishes. Cabinets, countertops, tiling and painting are on Renton’s no-permit list. Changing walls needs a building permit, and electrical, plumbing and mechanical work each need a separate permit.
Do I need a permit to remodel a bathroom in Renton?
Tile and other finish work need no permit. Plumbing work needs a separate plumbing permit. On a septic property, adding a bathroom also needs King County Environmental Health approval, and on flood hazard or critical area lots the exemptions don’t apply.
How do I apply for a building permit in Renton?
Electrical, mechanical, plumbing and re-roof permits can be applied for online through the city’s Civic Access portal. For other work, including an interior remodel, email the project details to permittech@rentonwa.gov and the city sends an upload link. Questions go to Renton Permit Services at 425-430-7215. When we take on your remodel, we handle the permit for our work.
Is American Home Builders licensed in Washington?
Yes. American Home Builders WA Inc holds Washington construction contractor license #AMERIHB759N2 (General), listed as active by the Department of Labor & Industries. You can check it any time with L&I’s Verify a Contractor tool.
How much does a home remodel cost in Renton?
It depends on the rooms, the size of the job, the finishes, and whether walls, plumbing or wiring move. We visit the house, look at the space and give you a detailed written estimate at no cost before any work is agreed.
Our Services
Service Areas
American Home Builders proudly serves homeowners throughout the Greater Seattle Area. From complete home remodels to kitchens, bathrooms, and exterior construction, our team delivers quality craftsmanship and dependable service across King County.
If you don’t see your area listed, we likely still serve it, just contact us and we’ll confirm.
- Kenmore
- Kent
- Kirkland
- Lake Stevens
- Lakewood
- Maple Valley
- Marysville
- Medina
- Mercer Island
- Mill Creek
- Mountlake Terrace
- Mukilteo
- Newcastle
- Normandy Park
- North Bend
- Olympia
- Port Orchard
- Poulsbo
- Puyallup
- Redmond