Home Remodeling in Bellevue, WA
Kitchen, bathroom and whole-home remodeling for Bellevue homeowners, from a licensed Washington general contractor. Free on-site estimates.
- WA License #AMERIHB759N2
- Free on-site estimates
- Bellevue permits handled
Bellevue General Contractor for Kitchens, Baths and Whole Homes
American Home Builders remodels kitchens, bathrooms, basements and whole homes in Bellevue, WA. One team takes the job from the first walkthrough to the final city inspection: design, the Bellevue permit, construction and the handover.
We work in every Bellevue neighborhood area, including Bridle Trails, Crossroads, Downtown, Eastgate, Factoria, Lake Hills, Newport, Northeast Bellevue, Northwest Bellevue, Somerset, West Bellevue, West Lake Sammamish, Wilburton, Woodridge, BelRed and Cougar Mountain/Lakemont.
Licensed in Washington: construction contractor license #AMERIHB759N2 (General), listed as active by the Department of Labor & Industries. Verify it on L&I.
What Are You Planning?
Pick a project to see what it covers and whether Bellevue is likely to ask for a permit.
Kitchen remodeling in Bellevue
New layouts, custom cabinetry, countertops, backsplash and lighting, planned around how you cook and how the kitchen connects to the rest of the house.
Permit: cabinets and countertops alone need no building permit. A non-structural kitchen remodel goes through Bellevue’s remodel permit, often the same day. Moving a load-bearing wall needs plan review.
What's included
- Layout and design planning
- Cabinets, countertops and backsplash
- Lighting and electrical updates
- Plumbing and gas line moves
Bathroom remodeling in Bellevue
Walk-in and curbless showers, soaking tubs, vanities, custom tile and storage, laid out to fit the room you have.
Permit: swapping a toilet or basin in the same spot needs no permit. Replacing a shower or tub does, and a bathroom remodel goes through the remodel permit.
What's included
- Walk-in and curbless showers
- Tubs, vanities and fixtures
- Tile floors and walls
- Ventilation and lighting
Basement and attic remodeling
Turn unfinished or underused space into a bedroom, an office, a gym or a family room.
Permit: converting a finished basement uses the remodel permit with no plan review. An unfinished basement needs plan review, and so do dormers and roof slope changes.
What's included
- Framing and drywall
- Insulation
- Electrical and lighting
- Flooring and finishes
Whole-home remodels and conversions
Open up a floor plan, update several rooms in one project, or turn the garage into living space.
Permit: non-bearing walls go through the remodel permit. Load-bearing walls, garage conversions and any new heated space need plan review.
What's included
- Open floor plans
- Garage conversions
- Whole-home rewiring
- Multi-room updates
Windows, doors, decks and roofing
Exterior work that protects the house and changes how it looks from the street.
Permit: same-size windows, doors and skylights in the same spot need no permit; new or wider openings need plan review. So do decks more than 30 inches above ground.
What's included
- Window and door replacement
- Deck building and remodeling
- Roofing
- Exterior painting
Does Your Bellevue Remodel Need a Permit?
In Bellevue a remodel lands in one of three places: no permit, a remodel permit with no plan review, or a permit with plan review. Tick what your project includes to see where it falls, based on the City of Bellevue’s Work Requiring Permits page.
Tick what your project includes
You'll see which items are on the city's permit list and which are on its no-permit list.
A summary of the City of Bellevue’s Work Requiring Permits page, not a ruling. Confirm with the Bellevue Permit Center at 425-452-4898 before work starts.
Remodeling in Bellevue: What to Plan For
Permits are filed online. Bellevue takes building permit applications through MyBuildingPermit.com, where inspections are scheduled too. Contractors working in Bellevue need a Washington L&I license and a Bellevue business license (City of Bellevue).
Same day or plan review. A remodel with no structural work can get its permit the same day. Work that needs plans, such as moving a load-bearing wall, goes through plan review, which may take about three weeks (City of Bellevue).
Inspections still apply. Even the no-plan-review permit has required inspections: before work starts, before concrete is poured, before framing or insulation is covered, and when the work is done.
Shoreline, slope and wetland lots. Work in a shoreline area or within 200 feet of a shoreline, or work that touches a critical area or its buffer, can need its own land use permit. We check the property before we price the work.
How a Bellevue Remodel Works With Us
Five steps, the same on every project, with the permit and the city inspections built into the schedule.
- 01
Free in-home consultation and written estimate
We visit, look at the space, talk through what you want and give you a detailed written estimate.
- 02
Design, plans and material selections
Plans and 3D renderings, plus cabinets, tile, fixtures and finishes, settled before work starts.
- 03
Bellevue permit and plan review
We submit the application on MyBuildingPermit.com and work through the city’s plan review.
- 04
Construction and city inspections
Demolition, framing and rough-ins, with the required city inspections along the way.
- 05
Final inspection and walkthrough
Finish work, the city’s final inspection, then a walkthrough with you before handover.
Before and After
Drag the handle to compare. More projects in our before and after gallery.
BeforeAfter
Bellevue Remodeling FAQ
Do I need a permit to remodel a kitchen in Bellevue, WA?
Replacing cabinets or countertops needs no building permit, though plumbing or electrical work may need its own. A non-structural kitchen remodel goes through Bellevue’s remodel permit with no plan review, often the same day. Moving a load-bearing wall needs plan review.
Do I need a permit to remodel a bathroom in Bellevue?
Replacing a toilet or basin in the same spot needs no permit. Replacing a shower or tub does, and a bathroom remodel goes through the no-plan-review remodel permit unless structural work is involved.
How do I apply for a building permit in Bellevue?
Online at MyBuildingPermit.com, the portal Bellevue uses for applications and inspection scheduling. A remodel with no structural work can get its permit the same day; plan review, when it’s needed, may take about three weeks. Questions go to the Bellevue Permit Center at 425-452-4898. When we take on your remodel, we handle the permit for our work.
Is American Home Builders licensed in Washington?
Yes. American Home Builders WA Inc holds Washington construction contractor license #AMERIHB759N2 (General), listed as active by the Department of Labor & Industries. You can check it any time with L&I’s Verify a Contractor tool.
How much does a home remodel cost in Bellevue?
It depends on the rooms, the size of the job, the finishes, and whether walls, plumbing or wiring move. We visit the house, look at the space and give you a detailed written estimate at no cost before any work is agreed.
Our Services
Service Areas
American Home Builders proudly serves homeowners throughout the Greater Seattle Area. From complete home remodels to kitchens, bathrooms, and exterior construction, our team delivers quality craftsmanship and dependable service across King County.
If you don’t see your area listed, we likely still serve it, just contact us and we’ll confirm.
- Kenmore
- Kent
- Kirkland
- Lake Stevens
- Lakewood
- Maple Valley
- Marysville
- Medina
- Mercer Island
- Mill Creek
- Mountlake Terrace
- Mukilteo
- Newcastle
- Normandy Park
- North Bend
- Olympia
- Port Orchard
- Poulsbo
- Puyallup
- Redmond